Annual Reseal Programme 2023-2024 There will be resurfacing work as part of Council's Annual Reseal Programme. The first round of resurfacing work will commence in November 2023 when the air and ground temperatures are warmer and should be completed by February 2024.
Drainage Improvement - Honi Taipua Street, Manakau Horowhenua District Council is starting construction on a drainage improvement project along Honi Taipua Street, spanning from the Mokena Kohere Street intersection to Number 35 Honi Taipua Street, Manakau.
Foxton Beach Road - Footpath Rehabilitation Horowhenua District Council will be replacing the damaged pathway on Foxton Beach Road.
Foxton Futures – Manawatū River Loop Foxton Futures – the rejuvenation of the Manawatū River Loop is a long-term aspiration of the people of Te Awahou / Foxton. Announcement : COVID-19 Delay: The toilet facility will be installed by March 2022.
Foxton Pools Upgrade Foxton Pools is getting an upgrade, with construction to begin in early February 2023. The improvements will allow the community year-round use of the pools.
Foxton Wastewater Discharge Working with iwi and landowners to develop and operate a land-based discharge system to replace the Foxton Loop discharge.
Inflow & Infiltration Reduction Programme Council and the Horowhenua Alliance regularly conduct inspections of wastewater and stormwater pipes and gully traps on properties in Levin, to ensure there is no connection between stormwater pipework and the local sewer. These inspections will take place between early November and early-mid December 2021.
Kennedy Drive to Cambridge Street Wastewater Reticulation Renewal Tatana Contractors, Levin are renewing and upgrading the existing wastewater main from the Kennedy Drive/Glen Street intersection through to Highbury Drive/Cambridge Street intersection to ensure a more reliable wastewater network.
Kings Drive Wastewater Reticulation Renewal The Kings Drive Wastewater pipe upgrade and renewal project will address the groundwater infiltration into the sewer network through aged pipes and accommodate the future growth of North East (NE) Levin.
Levin & Ōhau Water Supply Fluoridation Horowhenua District Council's one of 14 local authorities that have received a directive from the Director-General of Health under the Health (Fluoridation of Drinking Water) Amendment Act 2021 to start fluoridating Levin and Ōhau's drinking water supply. The aim is to complete the civil, mechanical, electrical and automation works by mid-November 2024 and start fluoridating the town water supply